Container Home: Lining up the containers - 11 July 2015
When I came back to begin work on connecting the containers together, I realized we had not completely pulled the container together. Luckily, I had built a very strong bumper for me Jeep. I connected a 6 ton steel cable to the d-ring and then ran that around a tree in the back and finally up to the shipping container, with a 5 ton come-along connected. The Jeep was braced up against that tree to keep it from being pulled down. The come-along pulled the container right in place. I then proceeded to weld the joints of the containers together.
I ended up having to do the same thing to the other end of the container.
Once I finished pulling the container together and welding them, I then welded them to the steel beams I had inlaid into the foundation.
There is a crevice in between the containers that has to be filled. I used backer rods to fill it in and allow for me to use free flowing contractor calk to seal the space.
I ended up having to do the same thing to the other end of the container.
Once I finished pulling the container together and welding them, I then welded them to the steel beams I had inlaid into the foundation.
There is a crevice in between the containers that has to be filled. I used backer rods to fill it in and allow for me to use free flowing contractor calk to seal the space.